NORTH
- WEST METROPOLITAN
|
|
|
|
|
|
|
|
|
|
1-
INVESTOR:
NORTH-WEST
METROPOLITAN AREA
AUTHORITY OF HO
CHI
MINH
CITY
86 LE THANH TON ST.
, DISTRICT 1, HCMC
TEL: (84.8) 8299330;
8249109; 8228223
Fax: (84-8) 8249108 – E-Mail:
bql-taybac@vn
n.vn
2.
OBJECTIVES:
The North-West Metropolitan Area of HochiMinh City is formed
in an agricultural land in the surburb of
Ho Chi Minh City
.
Building and developing the North-West Metropolitan Area is
expected to convert the economic structure from
agricultural-based to services-based economic, promote the
economic growth of the City and neighbouring regions. The
North-West Metropolitan Area would be a regional center, a
modern ecological metropolitan area with the harmony of urban
and social infrastructures, ensure a good environment for
residents.
3.
CURRENT STATUS:
Residental status:
Currently, the Area consists of some 30,000 inhabitants with
about 5,900 houses. Population density is 5 persons/ha, mainly
distributed along the trans-Asia highway and provincial route
No. 8.
Land
utilization status :
|
|
+
industry and handicraft land
+ Public works land
+ Land tenure
+ Commucation land
+ Cemetery land
+ Agricultural, fallow land
|
0.69%
0.16%
24.17%
0.90%
0.17%
73.91%
|
|
|
4.
LOCATION:
North-West Metropolitan Area is in the north-west
gateway of HCMC, 30 km away from the City center. Its
area is 6,000ha
with the width of 3-5 km, stretching some 18 km in
length adjoining:
-
Trans-Asia
highway in the East.
-
Long An
province in the west.
-
An-Ha
canal in the south; and
-
Canal
No. 14 and the boundary of Phuoc Hiep Commune, Cu chi
Dist. in the North.
|
 |
|
|
5.
PLANNING TASK:
North-West Metropolitan Area
includes: The centres of service, commerce, health, culture,
education and training, sports and physical training.… with
an enormous ability to give employment, fast economic growth
rate through the development of public services and trade.
Basing on economic- social factors, North-West Metropolitan
Area is planned as 6,000 ha with the expected population of
300,000, including:
-
Industrial
park: with some 70,000 laborers.
-
Services and
commerce field with some 130,000 official jobs.
-
Public works,
domestic and international education - training fields are
expected to attract some 60,000
laborers.
|
|
|
|
6.
STRUCTURE OF LAND UTILIZATION:
Urban construction land-use
to be 6,000 ha (100%), in which:
|
|
|
|
|
|
7-INVESTMENT
INCENTIVES:
-
Land rental exemption granted to: i/ technical and social
infrastructure building projects to be handed over to the
Government or of non – profitable character; ii/ housing
projects for low income people (Decree 02/2006/ND-CP dated
05/01/2006
).
- Land rental exemption granted to: education, healthcare,
culture, sport, science – technology projects for large
public usage (Decree 142/2005/ND-CP dated
14/11/2005
).
- Corporate Income Tax: 20% or 28%
- Tax holiday and tax reduction periods from
2
to 7 years depending on specific projects. (Decree
164/2004/ND-CP đated
22/12/2003
)
|
|