LAND
SITUATION IN H
C
M -
CITY'S EXPORT PROCESSING
ZONES AND
INDUSTRIAL PARKS AS OF
11/01/2005
AND LAND FUND AVAILABLE FOR LEASE IN 2005
----------------------------------------------
|
I
/. LAND LEASE SITUATION
|
|
EXPORT
PROCESSING ZONES/ INDUSTRIAL PARKS |
Location |
Area in License (ha) |
Area for Lease (ha) |
Area Occupied and Deposited (ha) |
Total area (ha) |
Area
avialable for Lease in 2005 (ha)* |
Factory
space available* |
Occupied
(ha) |
Deposited
(ha) |
| Tan
Thuan |
District 7 |
300 |
195.50 |
109.98 |
45.83 |
155.81 |
38 |
10,000
m2 |
| Linh
Trung I |
Thu Duc |
62 |
42 |
40.44 |
1.56 |
42.00 |
0 |
|
| Linh
Trung II |
Thu Duc |
61.70 |
47 |
39.27 |
1.5 |
40.77 |
0 |
|
| Binh
Chieu |
Thu Duc |
27.30 |
21 |
21 |
0 |
21 |
0 |
|
Tan
Tao
(Stage I) |
Binh Tan |
181 |
84.60 |
79.62 |
0 |
79.62 |
0 |
|
Tan
Tao
(Stage II) |
Binh Tan |
262 |
144.10 |
74.24 |
24 |
98.24 |
8.95 |
50,000
m2 |
Hiep
Phuoc
(Stage I) |
Nha Be |
332 |
200 |
67.43 |
86.57 |
154 |
60 |
|
| Vinh
Loc |
B. Tan |
207 |
120 |
100.75 |
9.80 |
110.55 |
2.50 |
3,679
m2 |
Tan
Binh
(Stage I) |
Tan Phu |
125.70 |
81.70 |
59.54 |
18.90 |
78.44 |
0 |
|
Tan
Binh
(Stage II) |
Tan Phu |
61.10 |
|
|
|
|
1.0 |
16,180m2 |
| Tan
Thoi Hiep |
District 12 |
29.40 |
21.40 |
21.40 |
0 |
21.40 |
0 |
|
| Le
Minh Xuan |
Binh Chanh |
100 |
66.23 |
58.21 |
8.02 |
66.23 |
0.43 |
3,000
m2 |
| North
- Western Cu Chi |
Cu Chi |
220.64 |
145 |
135.57 |
0 |
135.57 |
0 |
|
Cat
Lai II
(Stage I) |
District 2 |
42.60 |
30.74 |
12.28 |
18.46 |
30.74 |
0 |
|
Cat
Lai II
(Stage II) |
District 2 |
69.10 |
41.46 |
|
|
|
10 |
|
| Cai
Lai IV |
District 2 |
111.70 |
88.90 |
|
|
|
0 |
proposal for Residential
Area
|
| Phong
Phu |
Binh Chanh |
163.30 |
114.31 |
|
|
|
14 |
|
| Tan
Phu Trung |
Cu
Chi |
552.00 |
300.00 |
|
|
|
|
Established in 6/2004 |
| Total: |
3,035.8 |
1,659.24 |
838.98 |
195.39 |
1,034.37 |
134.88 |
79,859
m2 |
|
|
Notes:
(*)
Area avialable for Lease in 2004:
In IPs and EPZs, there are more than 140 ha of land with
infrastructure and 43.000 m2 of standard factory space
|
|
| II/.
Time
of land and factory space can be deliveried |
| EXPORT
PROCESSING ZONES/ INDUSTRIAL PARKS |
Time
of land and factory space can be deliveried in 2004 |
| Jan |
Feb |
Mar |
April |
May |
Jun |
July |
Aug |
Sept |
Oct |
Nov |
Dec |
| Tan Thuan |
|
|
|
|
|
|
|
|
|
|
|
|
| Linh Trung
I |
|
|
|
|
|
|
|
|
|
|
|
|
| Linh Trung
II |
|
|
|
|
|
|
|
|
|
|
|
|
| Binh Chieu |
|
|
|
|
|
|
|
|
|
|
|
|
| Tan Tao
(stage I) |
|
|
|
|
|
|
|
|
|
|
|
|
| Tan Tao
(Stage II) |
|
|
|
|
|
|
|
|
|
|
|
|
| Hiep Phuoc
(Stage I) |
|
|
|
|
|
|
|
|
|
|
|
|
| Vinh Loc |
|
|
|
|
|
|
|
|
|
|
|
|
| Tan Binh
(Stage I) |
|
|
|
|
|
|
|
|
|
|
|
|
| Tan Binh
(Stage II) |
|
|
|
|
|
|
|
|
|
|
|
|
| Tan Thoi
Hiep |
|
|
|
|
|
|
|
|
|
|
|
|
| Le Minh
Xuan |
|
|
|
|
|
|
|
|
|
|
|
|
| North-Western
Cu Chi |
|
|
|
|
|
|
|
|
|
|
|
|
| Cat Lai II
(Stage I) |
|
|
|
|
|
|
|
|
|
|
|
|
| Cat Lai II
(Stage II) |
|
|
|
|
|
|
|
|
|
|
|
|
| Cat Lai IV |
|
|
|
|
|
|
|
|
|
|
|
|
| Phong Phu |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| III/.
Land leasing prices and factory rental fees (for reference only) in
some IPs and EPZs of HCM-City in 2005 |
| IPs
and EPZs |
Land
leasing price
(USD/m2) |
Factory
rental fees
(USD/m2/ month) |
Electricity
(USD/KW/h) |
Water
(USD/m3) |
Maximum
Duration
for
lease |
| Tan Thuan |
108
(Deposit 5% for reserve) |
|
0.075 |
0.24 |
37
years |
| Hiep
Phuoc |
45
(Deposit 5% for reserve) |
|
0.10 |
0.25 |
43
Years |
| Cat Lai
(Sec. II) |
80-100
(Deposit 10% for reserve) |
|
0.07 |
0.35 |
47
years |
| Cat Lai
(sec. IV) (*) |
|
|
|
|
|
| Linh
Trung I |
Full
occupied |
|
0.07 |
0.38 |
|
| Linh
Trung II |
Full
occupied |
|
0.07 |
0.38 |
|
| Binh
Chieu |
Full
occupied |
|
0.08 |
0.38 |
|
| Tan
Binh |
Full
occupied |
|
0.075 |
0.35 |
|
| Tan
Tao |
Full
occupied |
|
0.07 |
0.25 |
|
| 80-100(Deposit
10% for reserve) |
2.7-3.5
((Deposit 6 months)) |
0.08 |
0.25 |
45
years |
| Vinh Loc |
Full
occupied |
|
0.07 |
0.18 |
|
| Le Minh
Xuan |
Full
occupied |
|
0.07 |
0.28 |
|
| Phong Phu
(*) |
|
|
|
|
|
| Tan Thoi
Hiep |
Full
occupied |
|
0.07 |
0.40 |
|
| Tay Bac
Cu Chi |
34-40
(deposit 5% for reserve) |
|
0.07 |
0.22 |
42 |
| Tan Phu
Trung |
|
|
|
|
|
|
| *
Zones are still underconstruction
|
|
| VI/.
Relocation,
compensation and expanded land situation
at
IPs and EPZs in HCM-City |
| INDUSTRIAL
PARKS |
LOCATION |
Total
Area in Business License (ha) |
Total
area of
retrieved land as of 1st Quarter of 2004
(ha) |
Total
area need to be retrieved (ha) |
The
expanding area (planned) (ha) |
Tan Tao
- Stage I
- Stage II |
Binh
Tan |
181
262 |
168.06
120.44 |
12.94
141.56 |
|
| Vinh Loc |
Binh
Tan, Binh Chanh, Hoc Mon |
202 |
188.15 |
13.85 |
67.70 |
| Tan Binh |
Tan
Phu |
186.80 |
176.30 |
10.50 |
61
(*) |
| North-Western
Cu Chi |
Cu
Chi |
220 |
199.87 |
20.13 |
145 |
| Tan Thoi
Hiep |
District
12 |
29.4 |
29.08 |
0.32 |
|
Hiep
Phuoc
- Stage I
- Stage II |
Nha
Be |
332 |
306.90 |
25.1 |
600 |
Cat Lai
II
- Stage I
- Stage II |
District
2 |
47.9
69 |
42 |
27 |
|
| Cat Lai
IV |
District
2 |
112 |
0 |
112 |
|
| Phong Phu |
Binh
Chanh |
163.30 |
18.33 |
144.97 |
|
| Le Minh
Xuan |
Binh
Chanh |
100 |
100 |
0 |
236.75 |
| Total: |
1,905.4 |
1,349.13 |
508.37 |
1,110.45 |
|
| *Source:
IPs' Report. |
| Currently,
IPs are planning to expand, such as Le Minh Xuan Industrial Park
with 236,75 ha;
Vinh
Loc
Industrial
Park
with 67,70 ha; Hiep Phuoc Industrial Park with 600 ha;
Tan
Binh
Industrial
Park
with 61,0 ha ... Therefore, The total land area that is available
for lease in 2005 will depend on the expanse progress of below IPs.
According to the rate of progress in 2004,
Tan
Phu
Trung
Industrial
Park
can obtain the
Governmental Approval for 525 ha of land. If the resettlement and
compensation progress are carried out smoothly, it can supply a
significant amount of land area to the land fund of 2005. |
|
| V/.
The Proposal Development Plan for 2020 of IPs |
| INDUSTRIAL
PARKS |
LOCATION |
Total
area planned up to 2010 (ha) |
Total
area planned up to 2020 (ha) |
Progress
of Project (Planning) |
Notes |
| Tan
Phu Trung |
Cu
Chi |
525 |
525 |
in
2004 |
|
| Nhi
Xuan |
Hoc
Mon |
105 |
105 |
in
2004 |
Industrial
groups have been established |
| An
Ha |
Binh
Chanh |
80 |
210 |
after
2004 |
Stage
I is 80 ha; Stage
II is 130 ha |
| Xuan
Thoi Thuong |
Hoc
Mon |
250 |
250 |
after
2004 |
|
| Total: |
960 |
1,090 |
|
|
|
| *Source:Master
Plan for IPs in 2010
(HCM-City’s Economy Institution – Hepza).
|
|